Facilities Management continuously endeavors to improve the Health Science Center infrastructure, be it the improvement of a clerical office or the renovation of a department floor. FM's team of dedicated men and women, from the time the clerk inputs work order data to the carpenter hammering the first nail to the housekeeper hauling away the last piece of scrap, all work together to get the job done.

 

Ongoing and Planned Projects

 

switchgear-improvements PARC Building Modifications

Facilities Management and Environmental Health & Safety is modernizing the PARC Building stairwells and exterior building entrances.

 

switchgear-improvements Improvements to Electrical Sustainability

Facilities Management has worked on the design and implementation of a new Switchgear, Automatic Transfer Switch, and Transformers for the electrical sustainability at the Long Campus.

 

Corridor Improvements 3.049V

UT Health San Antonio is pleased to announce the renovation of the 3rd floor V-Section corridor near the offices of the Department of Cellular and Integrative Physiology.

 

Cancer Center Clinical Renovations

The recently announced agreement between UT Health San Antonio and MD Anderson brings new funding from the UT System and private sources to improve the infrastructure at the Cancer Treatment and Research Center.

 

Medical and Dental Building Lab Renovation

Construction is currently underway for campus wide research lab renovation projects

 

Completed Projects

switchgear-improvements Radiology Oncology Vault Renovations

Renovations of vaults 2 and 4 of the Mays Cancer Center Grossman building for new Linear Accelarators completed.

 

switchgear-improvements UTPD Renovations on Long Campus

Renovations of the former Campus Bookstore were performed to provide a new technologically advanced home for the University Police Department.

 

Academic and Administration Building Renovations

Renovations completed at the Academic and Administration Building (AAB).

 

Briscoe Library Ramp Construction

Facilities Management renovated the access ramp in front of the Briscoe Library and the access ramps along the curbs near the accessible parking spaces.

 

MARC Clinical Expansion

The projects included converting the 7th and 8th floors from administrative space to clinical space and adding a nuclear medicine suite within the 3rd floor Radiology clinic.

 

Professional Administrative Resource Center Renovations

Facilities Management completed renovations of the Professional Administrative Resource Center (PARC) building.

 

 

 

Renovation of Lab on Fifth Floor of Medical School

Project combined multiple lab areas into one larger and modern laboratory.



 

Emergency Generator Upgrades on the Long Campus

Installation of additional emergency generators on the Long Campus complete.


 

 

 

Modernization of Elevators in McDermott and Dental School buildings

Improvements complete on multiple elevators.



 

 

 

Academic Learning and Teaching Center

Demolition of the Annex trailers and expanded parking
make way for the construction of a new facility on main campus.



 

Roof Replacement over L Section & the M/S Penhouses

Replacement portions of the Medical School Roof above L section and the penthouses completed.


 

Exterior Lighting Improvements

Facilities Management recently installed state of the art LED light fixtures.



 

 

 

Upgrades to Lecture Hall Corridor

Improvements to the corridor that connects the Lecture Hall to the Medical School in an effort to improve the pedestrian flow and provide additional seating for students and staff.



 

Elekta Linear Accelerator at the CTRC

Facilities renovation of vault paves way for installation of high-energy x-ray device.



 

Floor Modifications for Nursing School

Facilities Management recently completed targeted accessibility upgrades to several of the education spaces in the Nursing school.



 

 

 

Fire Sprinkler System Installation in Medical School

Year-round project provides 100% safety coverage of entire building .



 

Refresh of Classroom 309L

Construction Division completes refurbishing of key classroom in Medical Schoool.



 

Emergency Medicine Lecture Hall Lecture Hall, Emergency Medicine

Healthcare education enhanced with construction of hall and implementation of premium A/V system.



 

Center for Clinical Ultrasound, Undergraduate Medical Education Office

Ultrasound education enhanced with construction of center.



 

Expansion of Parking Lot # 8

Main visitor parking lot on Long Campus gets more spaces.



 

 

 

New Roof for the Briscoe Library



 

 

 

Renovation of 5th Floor Basic Science Building

Renowned immunologist to joins the HSC.



 

 

 

South Texas Simulated Teaching Hospital

Facility will provide real-world experiences at the Regional Academic Health Center (RAHC).



 

Greehey Chilled Water Expansion

Installation of water lines near the MARC and STRF buildings.



 

Cooling Towers of the Energy Plant

50-year old facility gets facelift.



 

Renovation of 5th Floor of Briscoe Library

HVAC overhaul, new paint and ceiling.



 

Nursing School Classroom Refresh

Winter break gave Facilities time to refurbish Nursing classrooms.



 

Renovation of the Medical Dean's Office

Space has been reconfigured for better use, new carpet and small kitchen.



 

School of Nursing's "Virtual Hospital"

Current sub-level area makes way for clinical skills labs.



 

Renovation of Ob/Gyn Laboratories

 

Grossman Building Roof Remodel

 

Modernization of Elevators in Lozano
Long campus buildings


Most heavily used elevators on the main campus get upgrades.



   



Renovation of Multi-disciplinary (MD) Labs in Dental School


Labs in the Oral and Maxillofacial Surgery department get a facelift.



 

Holly Auditorium remodeling

Main HSC auditorium gets modernized.



 

Photovoltaic System

Solar panels will reduce HSC's energy consumption.



 

Starbucks

The popular restaurant chain finds its way to the HSC.



 

MRI Scanners at McDermott
New Employee Health and Wellness Clinic


The HSC celebrates Wellness Week with the opening of a new clinic.



 

MRI Scanners at McDermott

Renovation of UT Police Service and Office Areas


Project completed with minimal interruption to UTPD's daily operations.



 


Renovation of the Pestana Lecture Hall


New seating, carpet and paint are just a few of the upgrades that the lecture hall received.



 

Library remodel - coming soon The Path to Improved Life at the HSC

A 'shared path' around the HSC perimeter to allow walking, jogging and other healthy means to get those 10,000 steps a day.

 

MRI Scanners at McDermott

MRI Scanners at the McDermott Clinical Science Building


The HSC receives three very powerful magnetic resonance imaging scanners.



 

Lozano Long Campus monument
Construction of the Lozano Long Campus Monument


In commemoration of the generous donation given by Joe R. and Teresa Lozano Long and the subsequent renaming of the HSC campus, FM built a beautiful monument that greets all who enter the University.

 

CTRC's Linear Accelerator
Construction of Site for CTRC's Linear Accelerator


The CTRC enlisted FM to help house a multi-million dollar machine aimed to treat cancer patients better and faster.

 

Nursing Courtyard

Renovation of the Nursing School Courtyard


The Nursing courtyard got a much-needed facelift. Increased space and wheelchair access are just a few of the enhancements.


 

Nursing Courtyard

Installation of Solar Lighting


FM's efforts of 'going green' has led to the use of solar lighting in the Courtyard and gazebo.



 